Application Documents
Application Form
- 1.1. Application Cover Letter
- 1.2. Application Guide
- 1.3. Application Form (unsigned)
- 1.4. s.55 Checklist
Draft Development Consent Order
Compulsory Acquisition Information
Plans
- 4.1. Location Plan
- 4.2. Land Plan
- 4.3. Works Plans
- 4.4. Illustrative Landscape Plans
- 4.5. Access and Rights of Way Plan
- 4.6. Statutory and Non-Statutory Sites or Features of Nature Conservation and Habitats Plan
- 4.7. Water Bodies in a River Basin Management Plan
- 4.8. Heritage Assets
- 4.9. Indicative Generating Station Plans
- 4.10. Indicative Electrical and Water Connection Plans
- 4.11. Indicative Wharf Plans
Reports
5.1.Consultation-Report-Report-and-Appendices
- 5.1 Consultation Report
- 5.1 Appendix 1 Consultation Compliance Checklist
- 5.1 Appendix 2 Statements of Community Consultation (SoCC)
- 5.1 Appendix 3 Phase One Consultation (Part One)
- 5.1 Appendix 3 Phase One Consultation (Part Two).pdf
- 5.1 Appendix 4 Phase Two Consultation
- 5.1 Appendix 5 Phase Three Consultation (Part One).pdf
- 5.1 Appendix 5 Phase Three Consultation (Part Two)
- 5.1 Appendix 6 Phase Four Consultation
- 5.2. Planning Statement
- 5.3. Design and Access Statement
- 5.4. Other Consents and Licences
- 5.5. Statutory Nuisance Statement
- 5.6. Electricity Grid Connection Statement
- 5.7. Combined Heat and Power Assessment
- 5.8. Fuel Availability and Waste Hierarchy Assessment
Environmental Statement
Environmental-Statement-Non-Technical-Summary
Environmental-Statement-Volume-I-Main-Chapters
- 6.2.1. Chapter 1 Introduction
- 6.2.2. Chapter 2 Project Need
- 6.2.3. Chapter 3 Policy and Legislation
- 6.2.4. Chapter 4 Site Selection and Alternatives
- 6.2.5. Chapter 5 Project Description.pdf
- 6.2.6. Chapter 6 Approach to Environmental Impact Assessment
- 6.2.7.Chapter 7 Consultation.pdf
- 6.2.8. Chapter 8 Cultural Heritage
- 6.2.9. Chapter 9 Landscape and Visual Impact Assessment
- 6.2.10. Chapter 10 Noise and Vibration
- 6.2.11. Chapter 11 Contaminated Land, Land Use and Hydrogeology
- 6.2.12. Chapter 12 Terrestrial Ecology
- 6.2.13. Chapter 13 Surface Water, Flood Risk and Drainage Strategy
- 6.2.14. Chapter 14 Air Quality
- 6.2.15. Chapter 15 Marine Water and Sediment Quality
- 6.2.16. Chapter 16 Estuarine Processes.pdf
- 6.2.17. Chapter 17 Marine and Coastal Ecology
- 6.2.18. Chapter 18 Navigational Issues
- 6.2.19. Chapter 19 Traffic and Transport
- 6.2.20. Chapter 20 Socio-Economics
- 6.2.21. Chapter 21 Climate Change
- 6.2.22. Chapter 22 Health
- 6.2.23. Chapter 23 Waste
- 6.2.24. Chapter 24 Major Accidents and Risk Management
- 6.2.25. Chapter 25 Transboundary Impacts
- 6.2.26. Chapter 26 Summary
- 6.2.27. Glossary
- 6.2.28. Scoping Opinion
Environmental-Statement-Volume-II-Figures
- 6.3.1. Chapter 1 Figure 1.1.pdf
- 6.3.2. Chapter 5 Figures 5.1 – 5.3.pdf
- 6.3.3. Chapter 8 Figure 8.1
- 6.3.4. Appendix 8.1 Figures A8.1 – A8.2
- 6.3.5. Chapter 9 Figures 9.1 – 9.5
- 6.3.6. Chapter 9 Figures 9.6 – 9.14
- 6.3.7. Chapter 9 Figure 9.15
- 6.3.8. Chapter 9 Figure 9.16
- 6.3.9. Chapter 9 Figure 9.17
- 6.3.10. Chapter 9 Figure 9.18
- 6.3.11. Chapter 9 Figure 9.19
- 6.3.12. Chapter 9 Figure 9.20
- 6.3.13. Chapter 9 Figure 9.21
- 6.3.14. Chapter 10 Figures 10.1 – 10.2
- 6.3.15. Chapter 11 Figures 11.1 – 11.7
- 6.3.16. Chapter 12 Figures 12.1 – 12.3
- 6.3.17. Appendix 12.1 Figures A12.1 – A12.2
- 6.3.18. Chapter 13 Figures 13.1 – 13.2.pdf
- 6.3.19. Appendix 13.1 Figures A13.1.1 – A13.1.2
- 6.3.20. Appendix 13.2 Figures A13.2.1 – A13.2.3
- 6.3.21. Chapter 14 Figures 14.1 – 14.5
- 6.3.22. Chapter 14 Figures 14.6 – 14.15
- 6.3.23. Chapter 15 Figures 15.1 – 15.3
- 6.3.24. Chapter 16 Figures 16.1 – 16.8
- 6.3.25. Chapter 17 Figures 17.1 – 17.10
- 6.3.27. Chapter 18 Figures 18.1 – 18.3
- 6.3.28. Chapter 19 Figures 19.1 – 19.7
Environmental-Statement-Volume-III-Technical-Appendices
- 6.4.1. Appendix 1.1 Statement of Competency
- 6.4.2. Appendix 6.1 List of Cumulative Schemes
- 6.4.3. Appendix 8.1 Cultural Heritage Desk Based Assessment
- 6.4.4. Appendix 8.2 Geophysical Survey Report
- 6.4.5. Appendix 9.1 Landscape and Visual Impact Assessment Methodology
- 6.4.6. Appendix 9.2 Representative Viewpoint Analysis Tables
- 6.4.7. Appendix 10.1 Baseline Noise Survey
- 6.4.8. Appendix 11.1 Land Quality Phase 1 Preliminary Risk Assessment
- 6.4.9. Appendix 11.2 Lincs Laboratory, Ground Investigation Report for Boston Waste Transfer Station
- 6.4.10. Appendix 11.3 T.L.P. Ground Investigation Report Proposed Power Generation Plant
- 6.4.11. Appendix 12.1 Extended Phase 1 Habitat Report
- 6.4.12. Appendix 13.1 Water Framework Directive Compliance Assessment
- 6.4.13. Appendix 13.2 Flood Risk Assessment
- 6.4.14. Appendix 14.1 Construction Phase Dust and Particulate Matter Assessment Methodology
- 6.4.15. Appendix 14.2 Dispersion Modelling Methodology
- 6.4.16. Appendix 14.3 Tabulated Assessment Results
- 6.4.17. Appendix 16.1 Supplementary Information to Estuarine Processes
- 6.4.18. Appendix 17.1 Habitats Regulations Assessment.pdf
- 6.4.19. Appendix 17.2 Breeding Bird Survey Report
- 6.4.20. Appendix 19.1 Boston Waste Transfer Station Summary
- 6.4.21. Appendix 19.2 Personal Injury Collision Location Plan
- 6.4.22. Appendix 19.3 Transport Assignment on Indicative Construction Programme
- 6.4.23. Appendix 19.4 2021 and 2025 Background Forecast Traffic Flows
- 6.4.24. Appendix 19.5 Junction Modelling Matrices
- 6.4.25. Appendix 19.6 Junction Modelling Outputs
- 6.4.26. Appendix 22.1 Health Baseline Statistics
Other Documents
- 7.1. Outline Code of Construction Practice
- 7.2. Outline Construction Traffic Management Plan
- 7.3. Outline Written Scheme of Investigation
- 7.4. Outline Landscape and Ecological Mitigation Strategy
- 7.5. Outline Lighting Strategy.pdf
- 7.6. Register of Environmental Actions and Commitments.pdf